Solar Power UWA

Major components of the system
- Photovoltaic panels 2.4 kW
- Inverter 2.5 kW
- Mounting frames
- Data logger
- Wiring
|
Conditions for obtaining the AGO rebate
- must be new or a new extension to an existing system
- must be installed on principle place of residence
- only one rebate per residence
- no other funding from the AGO
- PV designer, installer (SEIA) accredited, or competent
- meet relevant electrical and safety standards, regulations
- must have Western Power (in WA) approval if grid connected
- Supplier to provide 12 month warranty on system and installation
- minimum 2 year maintenance contract should be offered
- must operate on building for a minimum of five years
- must be available for inspection by State regulator and AGO
Approvals
SEDO
OOE
AGO
WP
MPER3
See Solar power urban for details of rebate system | |
|